Here you can submit nicknames

Nickname:
Verification: 4c2542

or vote for the best nickname!

(To vote for a nickname, first search the for nickname & then click the vote button beside it.)

You can also add comments on nicknames

such as meaning or a short profile.

Comments



Googlism comments


caiso is standing down to a stage 2
caiso is calling on all voluntary interruptibles and hopes to obtain more out of state imports to avert curtailment
caiso is considering a supplemental filing before ferc in which it would indicate the caiso's willingness to defer implementation of the phase ii elements
caiso is violating the automatic stay provision
caiso is the agency responsible for managing california's power grid
caiso is not yet submitting proposed revisions to its jurisdictional tariff to implement the msp
caiso is going to proceed with its 10 minute product regardless
caiso is working with various groups to identify and work through
caiso is and what it does
caiso is also in the midst of contemplating market reforms
caiso is a serious problem for california
caiso is considered a public utility
caiso is involved in market manipulations in conjunction with dwr
caiso is considering offering a recallable transmission service
caiso is using a direct current optimal power flow
caiso is minimal
caiso is working on a system to provide up to 48 hours notice of the possibility of rolling outages
caiso is now operating under a "soft cap" of $150/mwh
caiso is getting relief from san francisco and ncpa
caiso is contemplating
caiso is inconsistent with the cpuc's arguments before ferc with respect to the redesign of the caiso markets
caiso is a government organization responsible for running the california electrical grid
caiso is responsible for scheduling generation and load
caiso is effective at running a "monopsony" acap market
caiso is subject to ferc's exclusive jurisdiction over its transmission of electric energy in interstate commerce
caiso is facing
caiso is not prepared to implement an acap
caiso is over $200 million per year
caiso is the "system operator"
caiso is informed of virtually all aspects of each transmission transaction
caiso is authorized to spend to implement lmp
caiso is responsible for system reliability
caiso is embarking on a market redesign effort that is to be filed with ferc early to mid 2002
caiso is attempting to address the path 15 problems by having a 90 mile
caiso is an operating rto
caiso is expected to release its new sds
caiso is continuing to request additional supplemental energy bids during this period
caiso is coordinating a press conference on june 15
caiso is planning to develop more detailed and specific language
caiso is reviewing and how they're distributed
caiso is
caiso is directed to
caiso is not sufficiently independent to operate its interstate transmission facilities on a non
caiso is the only iso that didn't file a petition for declaratory order
caiso is declaring a
caiso is a nonprofit corporation that controls the long
caiso is incorrect
caiso is developing proposals for correcting flaws in california electricity markets
caiso is now taking a very appropriate 253 page 10
caiso is a non
caiso is sent at 6
caiso is not part of this rate adjustment public process
caiso is neither necessary
caiso is looking at the statewide load when issuing its alerts
caiso is smart
caiso is working to establish rto status at the ferc
caiso is concerned
caiso is an "independent" non
caiso is responsible for ensuring system reliability and that all electricity put into the grid has a corresponding exit from the grid
caiso is proposing revisions to or additional design details of specific design elements
caiso is seeking a larger customer base to mask the fact that the costs are out
caiso is responsible for the forecasting of electrical load for the state
caiso is a nonprofit iso that manages the grid but also allows for a separate power exchange
caiso is following traditional practice of planning for worst
caiso is the core institution that governs the operation of a large portion of the transmission system in california and the system's use as a platform for
caiso is responsible for
caiso is still in
caiso is given little time in which to manage this process
caiso is now controlled by the state government through the governor?s appointees
caiso is taking additional measures to ensure reliability
caiso is under its jurisdiction

Nickname caiso


  • caiso (Points: 0)
Homeowner Loans | Credit Cards | Mortgage Calculator | eBay | Northern Rock